Skip to main content
Alpha

This is a rebuild of Drinking Water Watch and not yet the official record. Use the agency’s current Drinking Water Watch for anything you need to rely on.

Stage 2 DBP

Facility
IDSE 23 Kipling W/A #1
Type
Dist System/Zone (DS)
Status
Active (A) Activity date January 5, 2024

Where this facility is sampled

We withheld the location of 2 sampling points below. The location on record identifies a private home, and we do not publish those. That is our decision, not the agency’s. The sampling point, its type and every result taken there are published unchanged.

Active sampling points at Stage 2 DBP.
Sampling point Description Type
SM1 Location withheld Point of Maximum Retention
SM2 Location withheld Midpoint in the Distribution System

This page shows active sampling points only and leaves out retired ones and the samples taken at them.